Resource Library

The Sacramento Area Flood Control Agency is pleased to offer a Resource Center designed to help visitors find the information they need with ease. This page contains a variety of agency documents, Board Meeting agendas and reports, policies, press releases, and videos.
If you are looking for a particular document or piece of information and are unable to locate it, SAFCA staff is available to assist you. Please click here for our contact information.
-
Board Agendas and Meeting Materials
Agenda & Meeting Material
Below, you may find the online version of our Board agendas and meeting materials. Some documents may not be available online due to limitations related to file size or format. To request copies of these documents, please contact SAFCA’s Office at (916) 874-8734 or e-mail SAFCABoardClerk@saccounty.gov.
Click this link to view the SAFCA Board Agendas and Meeting Materials
Executive Committee Meetings
SAFCA Executive Committee meetings are scheduled for the first Thursday of each month at 4:00 p.m. This meeting is a SAFCA Project briefing given by staff. Meetings are held at the Sacramento County Administration Building, 700 H Street, Sacramento, CA 95814 in Hearing Room 2. No virtual component.
Board of Director’s Meetings
The SAFCA Board of Directors Meetings are scheduled for the 3rd Thursday of the month at 3:00 p.m. Meetings are held at the Sacramento County Administration Building, 700 H Street, Sacramento, CA 95814 in the Supervisor’s Council Chambers. No virtual component.
Submit Public Comment
Public Comments can be made at the Board of Director’s Meeting by filling out a Request to Speak form, which will be located on the table at the back of the Council Chambers, and taken up to the clerk; or, a written comment may be submitted by email to: SAFCABoardClerk@saccounty.gov. Submissions made by email, must be submitted by 12 p.m. the day of the meeting. Public comments will be read into the record at the meeting. All Public Comments are limited to three (3) minutes.
Accommodation Request
For accommodation requests, please contact SAFCA’s Office by telephone at (916) 874-7606 (voice) and CA Relay Services 711 or email at SAFCABoardClerk@saccounty.gov prior to the meeting.
-
Notices (Press Releases)
The Sacramento Area Flood Control Agency (SAFCA) proposes to provide a benefit to the flood control system by constructing improvements to the Morrison Creek and Beach Lake levees funded in part by a Federal Emergency Management Agency (FEMA) grant. The project would raise approximately 17,550 linear feet (LF) (or 3.3 miles) of the existing levees, by regrading the existing levee crowns and performing minor landside slope fills; removing and replacing approximately 1,279 LF of existing floodwalls, and constructing an additional 437 LF of new floodwall; landside slope flattening, repair of an existing Union Pacific Railroad stoplog structure, construction of a new levee turnaround, and nature-based solutions enhancing the ecological function and long-term resilience of the levee system.
SAFCA has prepared an IS/MND in accordance with the requirements of the California Environmental Quality Act (CEQA) and the State CEQA Guidelines and SAFCA is requesting permission from the U.S. Army Corps of Engineers (USACE), Sacramento District, pursuant to Section 14 of the Rivers and Harbors Act of 1899 (33 USC 408), for the alteration of Federal flood management facilities.
The IS/MND is being circulated and is available for public review and comment for a 30-day period beginning on August 6, 2026 and ending on September 7, 2026.
The IS/MND may be reviewed at SAFCA’s website, Click Here or at its office at 1325 J Street, Suite 1700, Sacramento, CA 95814.
Please send written comments on the IS/MND to Dan Tibbitts, Sacramento Area Flood Control Agency, 1325 J Street, Suite 1700, Sacramento, CA 95814. Comments may also be sent via e-mail to SAFCAReview@saccounty.gov.
For e-mailed comments, please include the project title in the subject line, attach comments in MS Word format, and include the commenter’s name and U.S. Postal Service mailing address.
All comments must be received by SAFCA by 5 p.m. on September 7, 2026. SAFCA’s Board intends to consider adoption of the IS/MND at its regularly scheduled board meeting on September 17, 2026 at 3:00 p.m., to be held at the Sacramento County Board of Supervisors’ Chambers located at 700 H Street, Sacramento, CA 95814. This meeting is open to the public.
- Policies
-
Reports
AMERICAN RIVER WATERSHED COMMON FEATURES (ARCF) 2016
- American River Watershed Common Features (ARCF) General Reevaluation Report (GRR)
- ARCF – American River Erosion – Contract 1 (Site 2-1) – Supplemental Draft EA/EIR – Review Period June 5, 2020 to July 20, 2020
- ARCF – American River Erosion – Contract 2 (Site 2-2 and 2-3) – Supplemental Final EIS-EIR- Review Period June 4, 2021 to July 19, 2021
- ARCF – American River Erosion- Contract 3 (Site 1-1) – Supplemental EIR-EA- Review Period June 15, 2022 to August 8, 2022
ARCF2016: SACRAMENTO RIVER
- ARCF GRR: Sacramento River Seepage & Stability Sup. No. 1: Reach D, Front Street Stability Berm – Final (Reso 2019-036)
- ARCF GRR: Sacramento River Seepage & Stability Sup. No. 1: Reach D, Front Street Stability Berm – Draft SEA/IS (Reso 2019-036)
- ARCF GRR: Sacramento River Seepage & Stability Sup. No. 1: Reach D, Front Street Stability Berm – MMRP (Reso 2019-036)
- ARCF GRR: Sacramento River Seepage & Stability Sup. No. 1: Reach D, Front Street Stability Berm – MND (Reso 2019-036)
- ARCF GRR: Sacramento River Seepage & Stability Sup. No. 2: Beach Stone Lakes Mitigation Site – Final SEA/IS and MND (Jun. Reso 2019-087)
- ARCF2016- Sacramento River Erosion – Contract 1 (RM 55.2L) – Draft Supplemental EA/EIR – Review Period July 11, 2020 to August 26, 2020
- ARCF2016- Sacramento River Erosion – Contract 2– Supplemental Draft EA/EIR – Review Period July 8, 2020 to August 26, 2020
- ARCF 2016- Sacramento River Weir Widening – Supplemental Draft EIS/EIR – Review Period July 27, 2020 to September 14, 2020
ASSESSMENTS AND FEES
- Assessment Deferral Program Guidelines
- Consolidated Capital Assessment District No 2 Averages
- Development Impact Fee Program Final Report
- Development Impact Fee Program-Amendment (2020)
- Development Impact Fee Rates
- Natomas Basin Local Assessment District Averages
- Operations and Maintenance Assessment District No 1 Averages
- Resolution No. 2016-110 (Approving the SAFCA Development Impact Fee Program – 2016 Update)
- SAFCA Financial Reports
NATOMAS LEVEE IMPROVMENT PROGRAM (NLIP)
- NLIP- Local Funding DEIR Vol I. 11-06 – Programmatic Evaluation of the Proposed Funding Mechanisms
- NLIP- Local Funding DEIR Volume II. 11-06 – Level Evaluation of Natomas Cross Canal South Levee Phase 1 Improvements
- Final Environmental Impact Report (Phase 3)– Natomas Levee Improvement Program- Landside Improvement Project (CEQA)
- Draft Environmental Impact Statement/Environmental Impact Report to the Natomas Levee Improvement Program- Phase 3 Landside Improvements Project
- CEQA, Addendum 1 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 3 Landside Improvement Project (2009 / 05 FEIR)
- CEQA, Addendum 2 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 3 Landside Improvement Project (2011 / 08 FEIR)
- CEQA, Addendum 3 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 3 Landside Improvement Project (2014 / 07 FEIR)
- CEQA, Addendum 4 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 3 Landside Improvement Project (2017 / 05 FEIR
- Final Environmental Impact Report (Phase 4a)– Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2009 / 11 FEIR) (CEQA)
- Draft Environmental Impact Report (Phase 4a)– Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2009 / 11 FEIR)
- Executive Summary – Environmental Impact Report (Phase 4a)– Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2009 / 11 FEIR)
- (Phase 4a) Appendix A-Public Outreach Involvement
- (Phase 4a) Appendix B-Project Description
- (Phase 4a) Appendix C-Hydraulics Hydrology
- (Phase 4a) Appendix D-Bio Resources
- (Phase 4a) Appendix E-Cultural Resources
- (Phase 4a) Appendix F-AQ Modeling Results 8-5-09
- (Phase 4a) Appendix G-Noise Modeling Results
- (Phase 4a) Appendix H-US Census Block Groups Data
- (Phase 4a) Appendix I-Borrow Site Environmental Conditions-Kleinfelder
- CEQA, Addendum 1 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2011 / 02 FEIR)
- CEQA, Addendum 2 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2012 / 04 FEIR)
- CEQA, Addendum 3 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2012 / 07 FEIR)
- CEQA, Addendum 4 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2015 / 03 FEIR)
- CEQA, Addendum 5 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2018 / 11 FEIR)
- Final Environmental Impact Report (Phase 4b)– Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2010 / 10 FEIS.FEIR) (CEQA)
- Draft Environmental Impact Report (Phase 4b)– Natomas Levee Improvement Program- Phase 4a Landside Improvement Project (2010 / 10 FEIS.FEIR)
- CEQA, Addendum 1 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4b Landside Improvement Project (EIS.EIR 2017 / 10 FEIR)
- CEQA, Addendum 2 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4b Landside Improvement Project (EIS.EIR 2018 / 09 FEIR)
- CEQA, Addendum 3 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4b Landside Improvement Project (EIS.EIR 2018 / 12 FEIR)
- CEQA, Addendum 4 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4b Landside Improvement Project (EIS.EIR 2019 / 05 FEIR)
- CEQA, Addendum 5 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4b Landside Improvement Project (EIS.EIR 2020 / 02 FEIR)
- CEQA, Addendum 6 to the Environmental Impact Report- Natomas Levee Improvement Program- Phase 4b Landside Improvement Project (EIS.EIR 2020 / 05 FEIR)
- Videos
