Sacramento Area Flood Control Agency Flowing Water Flowing Water
 
 
 
 
 
 
 
 
 

NOTE:

This page is currently under construction.

 

Flood Protection

Completed Flood Protection Projects

American River Common Features Project

  • American River Common Features - Slurry Wall Construction
  • Installation of American River Basin Telemetry Gages
  • Bank Protection along the American River ­ Sites 1 through 5
  • American River Revegatation Sites
  • American River Common Features Jet Grout Contract 1
  • American River Erosion Protection RM 1.8
  • American River Erosion Sites 7.0R, 10.2L, 6.4L and 6.9
  • American River 10.0 Bank Stabilization

Folsom Dam

  • Folsom Reservoir Reoperation

North Area/Natomas/NLIP

  • North Area Local Project
    • Garden Highway through levee seepage
    • East/West Levee improvements along Steelhead Creek
      (aka ­ NEMDC)
    • Cross Canal Levee Improvements ­ Phase 1
    • Dry Creek North Levee
    • Robla Creek - Phase 1, 2, 3
    • Arcade Creek ­ Phase 1
    • NEMDC Pump Station
  • Natomas Levee Soil Boring Program
  • Sand Cove Park Emergency Streambank Protection Project
  • Dry Creek Debris Removal Project - Phase 1
  • Sacramento River RM 60.0 Jibbom Street Park Levee Widening

South Sacramento Streams Group/Pocket Area

  • Sacramento River East Bank-Pocket/Little Pocket  through levee seepage and nderseepage
  • South Sacramento Streams Group - Phase 1A (from Sacramento River  to UPRR) (2006)
  • Sacramento River RM 56.7 - Erosion Protection (2006)
  • Sacramento River Pioneer Reservoir Sites (Summer, 2006)  
  • Saramento River Underseepage mediation  Reach 2 and Reach 9 (2006)
  • Pocket Area - Sacramento River Erosion Sites (Summer, 2006)