| Completed
Flood Protection Projects
American River Common Features Project
- American River Common Features - Slurry Wall Construction
- Installation of American River Basin Telemetry Gages
- Bank Protection along the American River Sites 1 through 5
- American River Revegatation Sites
- American River Common Features Jet Grout Contract 1
- American River Erosion Protection RM 1.8
- American River Erosion Sites 7.0R, 10.2L, 6.4L and 6.9
- American River 10.0 Bank Stabilization
Folsom Dam
- Folsom Reservoir Reoperation
North Area/Natomas/NLIP
- North Area Local Project
- Garden Highway through levee seepage
- East/West Levee improvements along Steelhead Creek
(aka NEMDC)
- Cross Canal Levee Improvements Phase 1
- Dry Creek North Levee
- Robla Creek - Phase 1, 2, 3
- Arcade Creek Phase 1
- NEMDC Pump Station
- Natomas Levee Soil Boring Program
- Sand Cove Park Emergency Streambank Protection Project
- Dry Creek Debris Removal Project - Phase 1
- Sacramento River RM 60.0 Jibbom Street Park Levee Widening
South Sacramento Streams Group/Pocket Area
- Sacramento River East Bank-Pocket/Little Pocket through levee seepage and nderseepage
- South Sacramento Streams Group - Phase 1A (from Sacramento River to UPRR) (2006)
- Sacramento River RM 56.7 - Erosion Protection (2006)
- Sacramento River Pioneer Reservoir Sites (Summer, 2006)
- Saramento River Underseepage mediation Reach 2 and Reach 9 (2006)
- Pocket Area - Sacramento River Erosion Sites (Summer, 2006)
|